Browse Catalog
Image 4

Track Building Tools

Model Building Supplies

The jigs and supplies came a couple of days ago and I started making 6 of the 16 variations of the #6 Dual HO/HOn3 turnouts that I need for my layout. The products you sell are fantastic and the finished products are top-quality turnouts. Thanks

-Glen T.

Image 3

Track Building Tools

Model Building Supplies

My compliments on a well thought out and executed product. I can only say I wish I had thought of that.

-Jim W.

Image 6

The Trifecta

The Ultimate Track Gauge

Fast Tracks dedication to produce their excellent line of products will now have Mt Albert Scale Models and lumber to complement their business. Thanks to both companies and hope to continue dealing with them.

-David C.

Image 6

Track Building Tools

Model Building Supplies

I'm planning additional purchases for #8 turnout, dual-gauge turnout and straight track sections, wyes and crossovers, so I'll be back regularly. I already promised my godson all new trackwork for his new HO layout.

-Gene B.

Image 5

Track Building Tools

Model Building Supplies

One week after receiving my first order and laying my first pieces of trackwork, it appears to me that Fast Tracks is a WoooooooW company, with WoooooooW products, and operated by WoooooooW people in harmony with their baseline.

-Laurent L.

Image 2

Track Building Tools

Model Building Supplies

I have been ordering products from Fast Tracks for years. I was introduced to them by an art print that they sold & I checked out their products. I have purchased the sweep sticks and they were a life saver for me.

-William J.

Image 1

Track Building Tools

Model Building Supplies

So far I have built six turnouts and I have to say the Fast Tracks kit have made the work very satisfying. The filing jig makes the preparation of the frog rails and the point blades a simple matter.

-Chaz H.

Image 6

Track Building Tools

Model Building Supplies

It really is as easy as it looks! It took me 45 minutes to build my first turnout!

-Ben R.

Image 3

Track Building Tools

Model Building Supplies

Working carefully I am now making a turnout in about 45 minutes. The jig has cut down my costs in the number of turnouts I need and as my club needs to replace about 60 No.6 Shinohara turnouts this jig is going to make the replacements with ease.

-Robert C.

Image 6

The Trifecta

The Ultimate Track Gauge

In my opinion Fast Tracks products are... GREAT... and i can get a far superior turnout with their jig than any other pre-made product. If you are on the fence about getting into making your own track, I say do it!

-Joe B.

Image 1

Track Building Tools

Model Building Supplies

A friend of mine is getting ready to start his HO layout and after seeing my turnouts is sold on your product. I've found Fast Tracks so enjoyable to use that I offered to build all of his turnouts for him after he receives his!

-Jeff D.

Image 2

Track Building Tools

Model Building Supplies

I have no soldering experience or hand laying experience but after 2 hours I had a decent looking #6 turnout. Was second guessing code 55 but it was much easier than I thought.

-Rick C.

Image 4

Track Building Tools

Model Building Supplies

These sweep sticks are phenomenal! Very well made. The 2 pieces fit together perfectly. Simple to use and make perfect curves. I purchased the 9.75", 11", 15", 19", and 24" radius. I've used them in tight, yard areas.

-Tom N.

Image 5

Track Building Tools

Model Building Supplies

You need the book, it has been great to see up close pictures of turnout assembly step by step. The ease of opening & turning back to one page right next to your work is great.

-Daniel M.

Image 2

Track Building Tools

Model Building Supplies

Image 5

Track Building Tools

Model Building Supplies

Image 4

Track Building Tools

Model Building Supplies

Image 3

Track Building Tools

Model Building Supplies

Image 1

Track Building Tools

Model Building Supplies

Image 6

Track Building Tools

Model Building Supplies

Image 6

The Trifecta

The Ultimate Track Gauge


OUR MOST POPULAR CATEGORIES

THIS IS PROBABLY WHAT YOU ARe Looking FOR


Fixture Built Trackwork

The Art of The Possible