Your cart is currently empty!
Track Building Tools
Model Building Supplies
My kudos to all at Fast-Tracks for your wonderful products, instructions, videos, and manuals.
-Paul S.
Track Building Tools
Model Building Supplies
I do not normally write things like this but the service I received was first rate. I had email updates to let me know the status of my order and my parcel was shipped within 24 hours. I received the parcel about a week later which is fantastic.
-Andrew H.
Track Building Tools
Model Building Supplies
Just received my order, WOW! Very impressed with the quality of your products, very well thought out and well engineered. I can't wait to start building!
-Michael H.
Track Building Tools
Model Building Supplies
Hi, I just wanted to let you know my order arrived promptly and well packaged. I am extremely satisfied with your service and products. Fast Tracks is truly a one-stop paradise for those who choose to hand lay their track.
-Frank B.
Track Building Tools
Model Building Supplies
I have handlaid track but never considered handbuilding a turnout. Built my first Fast Tracks #6 turnout this weekend while watching football. Couldn't believe that I started and finished my first turnout in less time than I spent watching the game.
-John F.
Track Building Tools
Model Building Supplies
I was in awe of how perfect they were upon completion. I remember thinking two things: WOW and where the heck were you 35 years ago!!! (I think Tim was probably in grammar school). Nice Job Fast Tracks... you make us all look good!
-John S.
The Trifecta
The Ultimate Track Gauge
One week after receiving my first order and laying my first pieces of trackwork, it appears to me that Fast Tracks is a WoooooooW company, with WoooooooW products, and operated by WoooooooW people in harmony with their baseline.
-Laurent L.
Track Building Tools
Model Building Supplies
Working carefully I am now making a turnout in about 45 minutes. The jig has cut down my costs in the number of turnouts I need and as my club needs to replace about 60 No.6 Shinohara turnouts this jig is going to make the replacements with ease.
-Robert C.
The Trifecta
The Ultimate Track Gauge
I am a die-hard hand laying railroad track aficionado with many years experience. I decided to try the Fast Tracks systems for my most recent Sn3 railroad. I was quite frankly astounded that I had not done this before.
-Michael M.
Track Building Tools
Model Building Supplies
Thanks for great products and lending a helping hand to the modeling community.
-Tony R.
Track Building Tools
Model Building Supplies
Hi guys. Just wanted to say thanks for getting my order to me so quickly. I will be building a 30" by 80" switching layout using all handlaid track and turnouts. Something I have never done. All of the material you sent me will be put to good use.
-John B.
Track Building Tools
Model Building Supplies
I would like to let you know that my order arrived today. I am looking forward to giving it a try. As an aside, it is very nice looking and almost a piece of art in its own way.
-Greg E.
Track Building Tools
Model Building Supplies
The first one worked so good I ordered the second one. Easy to use and in gauge every time.
-Fred S.
Track Building Tools
Model Building Supplies
I just finished installing Bullfrog Turnout Controls on my HO layout and I have to tell you, these things are incredible. Assembly was a breeze and operation was as advertised..... perfect. Very clever and innovative design at an attractive price.
-Graham H.
Track Building Tools
Model Building Supplies
Track Building Tools
Model Building Supplies
Track Building Tools
Model Building Supplies
Track Building Tools
Model Building Supplies
Track Building Tools
Model Building Supplies
Track Building Tools
Model Building Supplies