Browse Catalog
Image 1

Track Building Tools

Model Building Supplies

Working carefully I am now making a turnout in about 45 minutes. The jig has cut down my costs in the number of turnouts I need and as my club needs to replace about 60 No.6 Shinohara turnouts this jig is going to make the replacements with ease.

-Robert C.

Image 3

Track Building Tools

Model Building Supplies

Recently I purchased the code 125/148 stockaid tool and in half of the time it would take me to hand file a single stock rail I had both for a new switch completed!

-Ken K.

Image 4

Track Building Tools

Model Building Supplies

It really is as easy as it looks! It took me 45 minutes to build my first turnout!

-Ben R.

Image 6

Track Building Tools

Model Building Supplies

I suffered a severe stroke which has left me right-side disabled. Each switch may take me a little more time to make than someone using both hands, but the design of the kits, make handmade track easy to make. And if I can do it, anyone can!

-Roja J.

Image 5

Track Building Tools

Model Building Supplies

As the old saying goes, ya gotta have the right tools for the job. If you’ve ever wanted to take a try at building your own turnouts this is the stuff to do it with.

-Marcel L.

Image 6

The Trifecta

The Ultimate Track Gauge

In my opinion Fast Tracks products are... GREAT... and i can get a far superior turnout with their jig than any other pre-made product. If you are on the fence about getting into making your own track, I say do it!

-Joe B.

Image 2

Track Building Tools

Model Building Supplies

My compliments on a well thought out and executed product. I can only say I wish I had thought of that.

-Jim W.

Image 3

Track Building Tools

Model Building Supplies

Don't fret over wondering if these tools are worth it, they absolutely are and you won't go wrong with any of the Fast Tracks product line!

-Ken K.

Image 5

Track Building Tools

Model Building Supplies

As the old saying goes, ya gotta have the right tools for the job. If you’ve ever wanted to take a try at building your own turnouts this is the stuff to do it with.

-Marcel L.

Image 1

Track Building Tools

Model Building Supplies

I'm very well pleased with the results and the faster assembly time. I make the switches at the bench and install them in a matter of minutes. Today I ordered a second fixture for #8 switches, and there will be more orders in the future.

-Mark J.

Image 6

Track Building Tools

Model Building Supplies

Absolutely Fantastic system. As an engineer I appreciate good design. The Fast-tracks system is superb. thanks!!!!!!

-Andy B.

Image 6

The Trifecta

The Ultimate Track Gauge

Your product is everything I could have hoped for and I recommend that other modelers simply overcome their initial caution and buy what they need on their very first order to start building quality track turnouts right away!

-Mike C.

Image 4

Track Building Tools

Model Building Supplies

I have nothing but great things to say about Fast Tracks. My only wish is that I had discovered them 10 years ago. I model in N scale and have been frustrated by the lack of reliable turnouts that look realistic. (I have tried them all.)

-Bob L.

Image 2

Track Building Tools

Model Building Supplies

Your new process for producing copper ties is a Great Leap Forward compared to the old cutoff method. The ties are flat and the edges very clean...minimal filing required.

-Bob C.

Image 5

Track Building Tools

Model Building Supplies

Image 4

Track Building Tools

Model Building Supplies

Image 6

Track Building Tools

Model Building Supplies

Image 1

Track Building Tools

Model Building Supplies

Image 3

Track Building Tools

Model Building Supplies

Image 6

The Trifecta

The Ultimate Track Gauge

Image 2

Track Building Tools

Model Building Supplies


OUR MOST POPULAR CATEGORIES

THIS IS PROBABLY WHAT YOU ARe Looking FOR


Fixture Built Trackwork

The Art of The Possible