Browse Catalog
Image 1

Track Building Tools

Model Building Supplies

My compliments on a well thought out and executed product. I can only say I wish I had thought of that.

-Jim W.

Image 5

Track Building Tools

Model Building Supplies

The Rail Bender actually made the curved turnouts fun to do. The Rail Bender should be on everyone's work table, it's worth every cent.

-Glen T.

Image 2

Track Building Tools

Model Building Supplies

I've received items in good order. Are you using a computer controlled milling machine? The work is fantastic, in fact outstanding work. I'll be placing another order shortly.

-Rob D.

Image 6

The Trifecta

The Ultimate Track Gauge

The three templates are as I expected, perfect. Our club purchased an HO #6, code 83 template and loved it... ...You have a great product at a very good price.

-Chris K.

Image 3

Track Building Tools

Model Building Supplies

It really is as easy as it looks! It took me 45 minutes to build my first turnout!

-Ben R.

Image 6

Track Building Tools

Model Building Supplies

If you want it done right, do it yourself. With the help of your assembly jigs never have I encountered a more simple assembly of a very complex item. Doing it myself has resulted in a switch that no company equals in quality and operation.

-Dave R.

Image 4

Track Building Tools

Model Building Supplies

To say that I was intimidated with the thought of building any trackwork would be an understatement. Your system is as I said before magnificent!!! Building turnouts couldn't be any easier, not to mention the results are out of this world.

-Ben V.

Image 1

Track Building Tools

Model Building Supplies

I purchased my bullfrog kit yesterday when I visited your shop and assembled it today. It was easy to assemble and fun to build. I installed it on one of my turnouts on my small layout. It works beautifully. just a fantastic invention.

-Hans B.

Image 5

Track Building Tools

Model Building Supplies

I recently switched to N scale, everyone thought I was nuts (I get frustrated fairly easy and don't have the smallest fingers). But after using your product I'm able to turn out flawless #6 turnouts in about 45 minutes, in N scale Amazing!

-Jeff D.

Image 3

Track Building Tools

Model Building Supplies

So far I have built six turnouts and I have to say the Fast Tracks kit have made the work very satisfying. The filing jig makes the preparation of the frog rails and the point blades a simple matter.

-Chaz H.

Image 6

Track Building Tools

Model Building Supplies

In my opinion Fast Tracks products are... GREAT... and i can get a far superior turnout with their jig than any other pre-made product. If you are on the fence about getting into making your own track, I say do it!

-Joe B.

Image 4

Track Building Tools

Model Building Supplies

I watched the videos and started working. I day later (about 1 hour per switch) I had 8 flawless, curved switches. I was in awe of how perfect they were upon completion.

-John S.

Image 6

The Trifecta

The Ultimate Track Gauge

Just wanted to let you know this turnout jig is FANTASTIC to say the least. Perfect turnout every time, I never had train roll so smooth through a switch.

-Tom V.

Image 2

Track Building Tools

Model Building Supplies

I'm very well pleased with the results and the faster assembly time. I make the switches at the bench and install them in a matter of minutes. Today I ordered a second fixture for #8 switches, and there will be more orders in the future.

-Mark J.

Image 1

Track Building Tools

Model Building Supplies

Image 2

Track Building Tools

Model Building Supplies

Image 3

Track Building Tools

Model Building Supplies

Image 4

Track Building Tools

Model Building Supplies

Image 6

Track Building Tools

Model Building Supplies

Image 6

The Trifecta

The Ultimate Track Gauge

Image 5

Track Building Tools

Model Building Supplies


OUR MOST POPULAR CATEGORIES

THIS IS PROBABLY WHAT YOU ARe Looking FOR


Fixture Built Trackwork

The Art of The Possible