Your cart is currently empty!
Track Building Tools
Model Building Supplies
My compliments on a well thought out and executed product. I can only say I wish I had thought of that.
-Jim W.
Track Building Tools
Model Building Supplies
The Rail Bender actually made the curved turnouts fun to do. The Rail Bender should be on everyone's work table, it's worth every cent.
-Glen T.
Track Building Tools
Model Building Supplies
I've received items in good order. Are you using a computer controlled milling machine? The work is fantastic, in fact outstanding work. I'll be placing another order shortly.
-Rob D.
The Trifecta
The Ultimate Track Gauge
The three templates are as I expected, perfect. Our club purchased an HO #6, code 83 template and loved it... ...You have a great product at a very good price.
-Chris K.
Track Building Tools
Model Building Supplies
It really is as easy as it looks! It took me 45 minutes to build my first turnout!
-Ben R.
Track Building Tools
Model Building Supplies
If you want it done right, do it yourself. With the help of your assembly jigs never have I encountered a more simple assembly of a very complex item. Doing it myself has resulted in a switch that no company equals in quality and operation.
-Dave R.
Track Building Tools
Model Building Supplies
To say that I was intimidated with the thought of building any trackwork would be an understatement. Your system is as I said before magnificent!!! Building turnouts couldn't be any easier, not to mention the results are out of this world.
-Ben V.
Track Building Tools
Model Building Supplies
I purchased my bullfrog kit yesterday when I visited your shop and assembled it today. It was easy to assemble and fun to build. I installed it on one of my turnouts on my small layout. It works beautifully. just a fantastic invention.
-Hans B.
Track Building Tools
Model Building Supplies
I recently switched to N scale, everyone thought I was nuts (I get frustrated fairly easy and don't have the smallest fingers). But after using your product I'm able to turn out flawless #6 turnouts in about 45 minutes, in N scale Amazing!
-Jeff D.
Track Building Tools
Model Building Supplies
So far I have built six turnouts and I have to say the Fast Tracks kit have made the work very satisfying. The filing jig makes the preparation of the frog rails and the point blades a simple matter.
-Chaz H.
Track Building Tools
Model Building Supplies
In my opinion Fast Tracks products are... GREAT... and i can get a far superior turnout with their jig than any other pre-made product. If you are on the fence about getting into making your own track, I say do it!
-Joe B.
Track Building Tools
Model Building Supplies
I watched the videos and started working. I day later (about 1 hour per switch) I had 8 flawless, curved switches. I was in awe of how perfect they were upon completion.
-John S.
The Trifecta
The Ultimate Track Gauge
Just wanted to let you know this turnout jig is FANTASTIC to say the least. Perfect turnout every time, I never had train roll so smooth through a switch.
-Tom V.
Track Building Tools
Model Building Supplies
I'm very well pleased with the results and the faster assembly time. I make the switches at the bench and install them in a matter of minutes. Today I ordered a second fixture for #8 switches, and there will be more orders in the future.
-Mark J.
Track Building Tools
Model Building Supplies
Track Building Tools
Model Building Supplies
Track Building Tools
Model Building Supplies
Track Building Tools
Model Building Supplies
Track Building Tools
Model Building Supplies
Track Building Tools
Model Building Supplies