






Track Building Tools
Model Building Supplies
I just finished installing Bullfrog Turnout Controls on my HO layout and I have to tell you, these things are incredible. Assembly was a breeze and operation was as advertised..... perfect. Very clever and innovative design at an attractive price.
-Graham H.
Track Building Tools
Model Building Supplies
Very impressed with the products supplied and I look forward to some mass production! Very much appreciated! Just noted the turnout control products... I can see another order coming up soon.
-Mike M.
Track Building Tools
Model Building Supplies
As the old saying goes, ya gotta have the right tools for the job. If you’ve ever wanted to take a try at building your own turnouts this is the stuff to do it with.
-Marcel L.
Track Building Tools
Model Building Supplies
Just wanted to say that there is nothing but good things to say about Fast Tracks products and the company. The tools and fixtures are well designed and manufactured and produce excellent results.
-Marcel L.
Track Building Tools
Model Building Supplies
I watched the DVD that came with the kit first. I followed the instructions on building my switch. I am proud of the quality of the form and how this turnout completed. I will recommend this product to everyone.
-Kristopher B.
Track Building Tools
Model Building Supplies
Hi, Fast Track Team I would like to let you know that I have received the 3 orders and that everything is perfect. I've tried a couple of turnouts #6, #8 and I just finished my fist slip switch #8 and I should say FANTASTIC!!
-Mario A.







Track Building Tools
Model Building Supplies
You need the book, it has been great to see up close pictures of turnout assembly step by step. The ease of opening & turning back to one page right next to your work is great.
-Daniel M.
The Trifecta
The Ultimate Track Gauge
Although I have scratch built switches before, this was extremely easy with no fiddling around with frogs or point rail to get them aligned correctly. Built first one in 1-3/4 hr. Well done
-Craig H.
Track Building Tools
Model Building Supplies
Just wanted to say thanks. I finally pulled everything out of the box and built my first turnout this past weekend... magnificent is the best way I can sum it up in one word.
-Ben V.
Track Building Tools
Model Building Supplies
I'm planning additional purchases for #8 turnout, dual-gauge turnout and straight track sections, wyes and crossovers, so I'll be back regularly. I already promised my godson all new trackwork for his new HO layout.
-Gene B.
Track Building Tools
Model Building Supplies
Working carefully I am now making a turnout in about 45 minutes. The jig has cut down my costs in the number of turnouts I need and as my club needs to replace about 60 No.6 Shinohara turnouts this jig is going to make the replacements with ease.
-Robert C.
Track Building Tools
Model Building Supplies
For those who are serious about model railroading, these jigs are terrific. After purchasing my No.6 jig I made six turnouts in no time and had no problems with rolling stock going through the turnouts after completing each turnout.
-Robert C.
Track Building Tools
Model Building Supplies
If you can build a craftsman kit you can easily master building your own turnouts. Just follow the video instructions exactly as the construction process is presented and you will have excellent turnouts.
-Bob L.
Track Building Tools
Model Building Supplies
Track Building Tools
Model Building Supplies
Track Building Tools
Model Building Supplies
Track Building Tools
Model Building Supplies
Track Building Tools
Model Building Supplies
Track Building Tools
Model Building Supplies
OUR MOST POPULAR CATEGORIES
THIS IS PROBABLY WHAT YOU ARe Looking FOR
Fixture Built Trackwork
The Art of The Possible
































